部品表の原価積上(Bill of Material and Formula Cost Roll-Up)
Section titled “部品表の原価積上(Bill of Material and Formula Cost Roll-Up)”iDempiere 13 標準プロセス(AD_Process_ID: 53062)
(標準メニュー未登録 / 間接使用)
This Process allow integrate Bill of Material & Formula Cost
This Process allow integrate Bill of Material & Formula Cost
Element Cost = Element Cost this level + Element Cost this low level
Total BOM Cost = Sum every Element Cost
| # | パラメータ | 必須 | 型 | 説明 |
|---|---|---|---|---|
| 10 | 組織 | Table Direct | Organizational entity within tenant | |
| 20 | 会計スキーマ | ✔ | Table Direct | Rules for accounting |
| 30 | 原価タイプ | ✔ | Table Direct | Type of Cost (e.g. Current, Plan, Future) |
| 40 | 在庫評価方法 | ✔ | List | Indicates how Costs will be calculated |
| 60 | 品目 | Search | Product, Service, Item | |
| 70 | 品目カテゴリ | Table Direct | Category of a Product | |
| 80 | 項目タイプ | List | Type of product |